Now that the Zena Homes application is officially filed with the Town of Ulster as of March 25, 2024, and following the first public presentation to the Ulster Planning Board, we wanted to take this opportunity to update our community with some of the highlights of the project.
First and foremost, we wanted to thank everyone involved. We believe we have put together an incredible team of professionals who have worked tirelessly, given the strict guidelines and the very public nature of the project. We also want to express our gratitude for the feedback we have received since the board presentation.
Hundreds of pages of information are available on the Town of Ulster’s Public Information page, and we encourage everyone to review them and follow along as the project progresses.
Zena Homes is a modest, low-density 30-lot residential subdivision of 106.6 acres of land located in the Town of Ulster. The property is located within the Town of Ulster’s R-60 Residence District, which is already the Town of Ulster’s most-restrictive zoning district, and we are only proposing to utilize approximately 38% of the site’s development potential. Seventy-seven (77) residences are permitted, but through our outreach in seeking community input over the past year, we have decided to propose thirty (30) lots. To be completely transparent as we’ve said we’d be since the beginning of this project – and to reiterate information disclosed in our application materials that are posted and publicly available on the Town of Ulster website – thirty lots does not necessarily mean thirty homes. Our intention is to build thirty single-family homes, but there are 6-8 lots that can accommodate two-family duplex homes. We understand the region’s affordability concerns and want to preserve the flexibility to provide different housing options.
The site layout is very intentional. We are well short of the number of residences allowed by zoning and by not maximizing the site’s development potential, we can preserve 72% of the 88 acres of existing forested area and limit new roads, buildings, and other paved or impervious surfaces to only 7% of the 106.6 acres available. Where tree clearing is required for wells and septic, for example, we propose to replace any clearing with native plants to maintain and support the sites’ flora and fauna. We have also initiated consultations with the appropriate state and federal agencies on species and have already received signoff from the U.S. Fish and Wildlife Service for the Northern Long-Eared Bat, finding that the project will have no effect. We eagerly await the rest.
We have heard the concern about access. The roadway system for the residential subdivision will be designed to meet all local and state requirements for publicly accessible, but privately maintained, roads. The only development activity in the town of Woodstock will be to upgrade portions of Eastwoods Drive and extend it approximately 1,400 feet. Eastwoods Drive is an existing private road that we own and maintain, that serves several existing residences. Eastwoods Drive, and the new subdivision roads, will continue to be privately maintained by a Homeowners Association, alleviating any burden on the towns of Ulster or Woodstock. Similarly, we have met with both the Ruby Fire Department and Woodstock Fire District. The Ruby Fire Department will collect full taxes from the development and we are committing to make yearly contributions to the Woodstock Fire District, ensuring both town’s emergency services receive their fair share, should they ever have to answer a call to the development. Through these measures, the project will be self-sufficient and not be a burden to either town’s taxpayers.
No one project will solve the housing crisis that plagues our county, state, and nation. However, the astronomical costs are directly linked to a lack of adequate housing stock. It is well studied that tens of thousands of new units are required across the state – at all price points – to address the housing crisis. Indeed, our project is designed to support single- and two-family homes, to provide flexibility and different affordability options on the thirty lots to be created. Our aim is to be thoughtful with every decision. Our traffic study assumes fifty-six (56) homes (almost double if what we plan to build), and we did this specifically to “pressure test” the neighborhood. Even at that number, the project will generate a limited amount of new traffic and will not negatively affect the adjacent roadway network, as confirmed by an expert professional traffic operations engineer.
We understand, given all the attention this project has received, that it may be hard to decipher what is accurate and what is hearsay. Again, we encourage anyone who is interested to review the materials posted on the Town of Ulster Public Information Page and attend the upcoming planning board meetings, which are open to the public. Underscoring our desire to be transparent, if you have any questions, please email us directly on our website. We are excited to continue to the next steps towards presenting our project publicly.
Even Kleinberg and Eddie Greenberg, Zena Development, LLC